top of page

Municipal Division

Portfolio Highlights

Our digital portfolio highlights a diverse range of projects where our team of experts supplied the best products in the industry. With a meticulous approach and unwavering commitment to excellence, we have consistently delivered exceptional results from the initial design stages to project completion. Explore our portfolio highlights and witness the unmatched quality and expertise that have made us the go-to choice for municipalities seeking reliable and efficient water systems.

Engineer: AECOM

Contractor: Waterline Industries Corp.

Project: Fisher Street WPF Improvements

Equipment Provided:

  • (2) Sulzer JTS-16CLC 6-STG vertical turbine pumps w/GE 350HP vertical hollow shaft motors

    • Designation: Finished Water

    • Design Point: 2,600GPM @ 440' TDH

The Fisher Street WPF Improvements project was started in 2019 and completed in 2021. Premier Pump & Supply, Inc. was selected by the general contractor to provide the pumping equipment, worked on the projected through the submittal process all the way up to check out testing and final completion.

Westborough, MA

Fisher Street WPF Improvements

Contractor: C.H. Nickerson

Project: Water Treatment Plant - DBO

Equipment Supplied:

  • (3) Sulzer JTS-16CLC 3-STG vertical turbine pumps w/GE 200HP vertical solid shaft motors

    • Designation: Raw Water

    • Design Point: 2,465GPM @ 218' TDH

  • (3) Sulzer JTS-18CC 2-STG vertical turbine pumps w/GE 75HP vertical solid shaft motors

    • Designation: Finished Water

    • Design Point: 2,465GPM @ 90' TDH

  • (2) Sulzer JT-24QMC 1-STG vertical turbine pumps w/GE 125HP vertical solid shaft motors

    • Designation: Filter Backwash

    • 7.746GPM @ 25' TDH

This project began in 2018 and was completed in 2020. This was a design/bid/build project where Premier Pump & Supply, Inc. teamed up with the contractor and engineer to select the best pumps for the application, supplied the equipment and supported the project through to completion.

Woonsocket, RI 

Water Treatment Plant

Engineer: AECOM

Contractor: Winston Builders Corp.

Project: Chestnut Street Water Treatment Facility

Equipment Provided:

  • (3) Sulzer JTS-11HC 3-STG vertical turbine pumps with GE 60HP vertical hollow shaft motors

    • Designation: Finished Water Pump

    • Design point: 800GPM @ 190' TDH

  • (3) Sulzer JTS-13CLC 3-STG vertical turbine pumps with GE 20HP vertical hollow shaft motors

    • Designation: Backwash Pump

    • Design point: 850GPM @ 60' TDH

  • (1) Sulzer CS-7H 2-STG submersible turbine with Franklin 25HP submersible motor

    • Designation: Well Water Supply

    • Design point: 500GPM @ 125' TDH

  • (2) Sulzer JTS-11LC 5-STG vertical turbine pumps with GE 20HP vertical hollow shaft motors

    • Designation: Well Water Supply

    • Design point: 450GPM @ 110' TDH

  • (1) Sulzer JTS-9LC 6-STG vertical turbine pump with GE 10HP vertical hollow shaft motor

    • Designation: Well Water Supply

    • Design point: 250GPM @ 100' TDH

  • (2) Sulzer CPE 11-1.5 centrifugal pumps with Baldor 10HP horizontal motors

    • Designation: Filter Recycle Water

    • Design point: 150GPM @ 120' TDH

The Chestnut Street Water Treatment Facility project was started in 2019 and completed start-up in 2020. Premier Pump & Supply, Inc. worked with the engineer on the initial design, was awarded the job by the general contractor, and supported the project all the way through to completion.

Foxborough, MA

Chestnut Street Water Treatment Facility

Engineer: Woodard & Curran

Contractor: Waterline Industries Corp.

Project: UNH Treatment Plant & Oyster River PS Upgrades

Equipment Provided:

  • (3) Sulzer JTS-11LC 4-STG vertical turbine pumps w/GE 50HP vertical hollow shaft motors

  • Designation: Finished Water

  • Design Point: 675GPM @ 203' TDH

  • (2) Sulzer JTS-18EC 1-STG vertical turbine pumps w/GE 25HP vertical hollow shaft motors

  • Designation: Backwash Pump

  • Design Point: 2,800GPM @ 25' TDH

  • (2) Sulzer JTS-13CLC 2-STG vertical turbine pumps w/GE 40HP vertical hollow shaft motors

  • Designation: Raw Water Pump

  • Design Point: 1,389GPM @ 70' TDH

  • (2) Sulzer JTS-8AC 5-STG vertical turbine pumps w/GE 5HP vertical hollow shaft motors

  • Designation: Recycle Water Pump

  • Design Point: 140GPM @ 69' TDH

  • (2) Sulzer CST-6M 2-STG vertical turbine pumps w/GE 3HP vertical hollow shaft motors

  • Designation: Return Recycle Pump

  • Design Point: 100GPM @ 25' TDH

  • (1) Sulzer XFP 105J-CB2 w/Sulzer 75HP submersible motor

  • Designation: Raw Water Pump

  • Design Point: 1,380GPM @ 124' TDH

The UNH /Oyster River project was started in 2017 and was completed in 2019. This was a design/bid/build project where Premier Pump & Supply, Inc. teamed up with the contractor and engineer to design the best possible system, supplied the equipment and supported the project through to completion.

Durham, NH

UNH Treatment Plant & Oyster River PS Upgrades

Engineer: CDM-Smith

Contractor: Daniel O'Connell's Sons

Project: Bucklin Point Facility Improvements

Equipment Provided:

  • (4) Sulzer SJP-24PO 1-STG vertical propeller pumps w/GE 75HP vertical solid shaft motors

    • Designation: Effluent Pumps

    • Design Point: 16,180GPM @ 14.25' TDH

The Bucklin Point Facility Improvements project started in 2011 and was completed in 2013. Premier Pump & Supply, Inc. worked with the engineer on selecting replacement pumps for older Johnston "Sulzer" propeller pumps, was awarded the project by the GC to provide the pumping equipment, and worked with the GC from the start of the submittal process all the way up to final checkout/completion.

Bucklin Point Facility Improvements

Providence, RI

Engineer: Woodard & Curran

Contractor: Winston Builders Corp.

Project: Albertini Water Treatment Facility Upgrades

Equipment Provided:

​

  • (2) Sulzer JTS-13CLC 2-STG vertical turbine pumps with GE 50HP vertical solid shaft motors

    • Designation: Backwash Pump

    • Design Condition: 1,350GPM @ 115' TDH

  • (2) Sulzer JTS-13CLC 5-STG vertical turbine pumps with GE 125HP vertical solid shaft motors

    • Designation: Finished Water Pump

    • Design Condition: 1,500GPM @ 260' TDH

The Albertini Water Treatment Facility Upgrades project started in 2011 and completed in 2012. Premier Pump & Supply, Inc. was awarded the project by the GC and supported the project all the way through to completion.

Mansfield, MA

Albertini Water Treatment Facility Upgrades

bottom of page